Attention
Planned Water Outage
In order for BGJWSC staff to complete maintenance upgrades in the area, water service will be intermittent from at or about 8:00 a.m. to 4:00 p.m. on Thursday, August 5, 2021 for service connections on Postell Drive, Wesley Oaks Drive and adjacent streets.
Once service has been restored, a precautionary boil water advisory may be issued until 24 hours following the last point of repair. Please subscribe to receive emergency updates via text message, email or...
Request for Proposal No. 22-004 Harrington Administration Building Roof Replacement
22-004 Harrington Admin Roof Replacement
Addendum No. 1 — Harrington Roof Replacement 22-004
Addendum No. 2 — Harrington Roof Replacement 22-004
Notice of Award — Harrington Roof Replacement
All-Clear for Boil Water Advisory Issued for Ogden Drive in Brunswick
Effective immediately, as of 5:48 PM on Thursday, July 22, 2021, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Ogden Drive on Tuesday, July 20, 2021 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment.
This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.
Though the water from this system can now be considered to meet...
Precautionary Boil Water Advisory – Ogden Drive in Brunswick – Tuesday, July 20, 2021
DRINKING WATER WARNING
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
The Brunswick water system lost pressure on the distribution network serving Ogden Drive due to materials failure of a 2″ PVC main. Service has been restored and BGJWSC lab personnel have collected water samples for testing. This testing, which takes between 18 and 24 hours, should be completed the afternoon of Wednesday, July 21, 2021 at which time an all-clear message will be posted.
This loss of pressure in the...
Commission Meeting Minutes – Thursday, June 17, 2021
For your consideration, please read the minutes from the Commission Meeting held on Thursday, June 17, 2021 at 2:00 p.m. in the Commission Meeting Room.
Commission Meeting Minutes 6-17-21 with Attachments
To read the minutes, please open or download the pdf from the link above, or you may see more below.
Finance Committee Meeting Minutes – Wednesday, June 16, 2021
For your consideration, please read the minutes from the Finance Committee Meeting held on Wednesday, June 16, 2021 at 3:00 p.m. in the Commission Meeting Room.
Finance Committee Minutes 6-16-21 with Attachments
To read the minutes, please open or download the pdf from the link above, or you may see more below.
Facilities Committee Meeting Minutes – Wednesday, June 16, 2021
For your consideration, please read the minutes from the Facilities Committee Meeting held on Wednesday, June 16, 2021 at 1:00 p.m. in the Commission Meeting Room.
Facilities Committee Minutes 6-16-21 with Attachments
To read the minutes, please open or download the pdf from the link above, or you may see more below.
Public Notice – Industrial Pretreatment Program Substantial Modifications – Academy Creek Water Pollution Control Plant (GA0025313)
PUBLIC NOTICE
STATE OF GEORGIA Department of Natural Resources Environmental Protection Division 2 MLK, Jr. Dr., Suite 152E, Atlanta, GA 30334
BGJWSC – Industrial Pretreatment Program Modification Approval
The Environmental Protection Division (EPD) has made a tentative determination that the substantial...
Commission Meeting Agenda – Thursday, July 15, 2021 @ 2:00 PM
For your consideration, please review the agenda for the Commission Meeting scheduled to be held on Thursday, July 15, 2021 at 2:00 p.m. in the Commission Meeting Room.
Commission_Meeting_Agenda_July 15_2021 – Posted 7/12/21.
Finance Committee Meeting Agenda – Wednesday, July 14, 2021 @ 3:00 PM
For your consideration, please review the agenda for the Finance Committee Meeting scheduled to be held on Wednesday, July 14, 2021 at 3:00 p.m. in the Commission Meeting Room.
BGJWSC_Finance_Committee_Agenda_July_14,_2021 – Posted 7/12/21.