Project Info – North Mainland WPCF Land Acquisition and Engineering

Project Number: District and General Location: Located in the North Mainland District Total Budget: $TBD Anticipated Construction Completion Date: TBD Details: The project consists of purchasing the property and plant engineering design to meet future infrastructure and system needs. Purpose: The purpose of the project is to secure a future public wastewater treatment plant site to serve the North Mainland District residents on the public sewer system. Have More Questions? Please Contact...

Continue reading

Project Info – South Mainland – Pump Station 3114 Forcemain Reroute

Project Number: District and General Location: South Mainland District along South Port Parkway to the South Port Wastewater Treatment Plant Total Budget: $400k Anticipated Construction Completion Date: TBD Details: The project consists of separate forcemain and reroutes to the head of the plant. Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy savings and...

Continue reading

Project Info – SSI – Pump Station 2033 and 2034 Rehab

Project Number: District and General Location: PS 2033 on 2913 Lawrence Road, Saint Simons Island PS 2034 on 130 Rice Mill Road, Saint Simons Island Total Budget: $1.4M Anticipated Construction Completion Date: TBD Details: The project consists of the rehabilitation of Pump Station 2033 and 2034 due to the existing condition North end of Saint Simons Island. Purpose: The purpose of the project is to ensure continuous delivery of wastewater to the Dunbar Treatment Plant.  Improvements...

Continue reading

Project Info – SSI – Pump Station 2056 Pumps and Forcemain Improvements

Project Number: District and General Location: Located in the Saint Simons Island District along Lawrence Road. Total Budget: $700k Anticipated Construction Completion Date: TBD Details: The project consists of installing new pumps, discharge piping, and a parallel forcemain. Purpose: The purpose of the project is to operate with better efficiency, reduce maintenance and provide up-to-date monitoring with enhanced technology. And for the new sewer main installation to reduce maintenance...

Continue reading

Project Info – Mall EST and Oglethorpe EST Rehab

Project Number: District and General Location: Glynn Place Mall EST, North Mainland District Oglethorpe EST, Saint Simons Island District. Total Budget: $1M Anticipated Construction Completion Date: TBD Details: The project consists of rehabilitation and painting for the Elevated Storage Tank (EST) at Glynn Place Mall EST and Oglethorpe EST. Purpose: The purpose of the project is to provide reliable water supply and pressure for the surrounding community and fire suppression needs while...

Continue reading

Project Info – North Mainland – Pump Station 4105 Forcemain Reroute

Project Number: District and General Location: Located in the North Mainland District along Cate Road and Crispen Boulevard toward Highway 341. Total Budget: $1.25M Anticipated Construction Completion Date: TBD Details: The project consists of installing a new forcemain from Pump Station 4105 to Highway 341 Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy...

Continue reading

Project Info – Systemwide – Water Production SCADA

Project Number: District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District Total Budget: $750k Anticipated Construction Completion Date: TBD Details: The project consists of converting the existing Water Production Supervisory Control and Data Acquisition (SCADA) to the new VTSCADA system.  The existing control system receives input from several controls and instruments, many of which are reaching the end of their useful lives and...

Continue reading

Project Info – Academy Creek Ras Replacement

Project Number: District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street. Total Budget: $1.5M Anticipated Construction Completion Date: TBD Details: The project consists of replacing existing return activated sludge (RAS) pumps, piping, and electrical with chopper-style pumps due to the existing equipment systems reaching the end of their service life and needing to be replaced. Purpose: The purpose of the project is to replace aging equipment to...

Continue reading

Project Info – Systemwide – GA Environmental Finance Authority Loan Debt Service

Project Number: District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District. Total Budget: $1.21M Anticipated Construction Completion Date: TBD Details: GEFA’s water and sewer financing programs offer low-interest financing for drinking water, reservoirs and water supply, water quality, stormwater and solid waste infrastructure. The JWSC has secured GEFA’s Clean Water State Revolving Fund Loan. Purpose: The purpose of the loan is...

Continue reading

Project Info – South Mainland – City of Brunswick – Pump Station 3101, 4001, and 4002 Upgrade

Project Number: District and General Location: PS3101 on 293 South Port Parkway, South Mainland PS4001 on 301 3rd Avenue, the City of Brunswick PS4002 on 1309 Reynold Street, City of Brunswick. Total Budget: $TBD Anticipated Construction Completion Date: TBD Details: The project consists of the repair of the station roofs, and painting, along with pump and piping modifications. Detailed station work includes the magnetic flow meter installation, odor control unit, replacing outdated...

Continue reading