Project Number:
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District
Total Budget: $750k
Anticipated Construction Completion Date: TBD
Details: The project consists of converting the existing Water Production Supervisory Control and Data Acquisition (SCADA) to the new VTSCADA system. The existing control system receives input from several controls and instruments, many of which are reaching the end of their useful lives and...
Project Info – Academy Creek Ras Replacement
Project Number:
District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street.
Total Budget: $1.5M
Anticipated Construction Completion Date: TBD
Details: The project consists of replacing existing return activated sludge (RAS) pumps, piping, and electrical with chopper-style pumps due to the existing equipment systems reaching the end of their service life and needing to be replaced.
Purpose: The purpose of the project is to replace aging equipment to...
Project Info – Systemwide – GA Environmental Finance Authority Loan Debt Service
Project Number:
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District.
Total Budget: $1.21M
Anticipated Construction Completion Date: TBD
Details: GEFA’s water and sewer financing programs offer low-interest financing for drinking water, reservoirs and water supply, water quality, stormwater and solid waste infrastructure. The JWSC has secured GEFA’s Clean Water State Revolving Fund Loan.
Purpose: The purpose of the loan is...
Project Info – South Mainland – City of Brunswick – Pump Station 3101, 4001, and 4002 Upgrade
Project Number:
District and General Location: PS3101 on 293 South Port Parkway, South Mainland PS4001 on 301 3rd Avenue, the City of Brunswick PS4002 on 1309 Reynold Street, City of Brunswick.
Total Budget: $TBD
Anticipated Construction Completion Date: TBD
Details: The project consists of the repair of the station roofs, and painting, along with pump and piping modifications. Detailed station work includes the magnetic flow meter installation, odor control unit, replacing outdated...
Project Info – North Mainland – North Mainland Water Loops
Project Number:
District and General Location: North Mainland District Water Loops installation along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway.
Total Budget: $2.M
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of water loop installations along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway in the North Mainland District via open-cut and trenchless methods.
Purpose: The purpose of the project is to eliminate dead...
Project Info – North Mainland – Canal Road Water Production Facility
Project Number:
District and General Location: North Mainland District Canal Road Well Site at104 Canal Road
Total Budget: $TBD
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of the conversion of an existing fire well to a Water Production Facility on Canal Road in the North Mainland District.
Purpose: The purpose of the project is to meet supply-demand and capacity, water storage capacity, and increased fire flow capacity into the region.
Have More...
Project Info – North Mainland – Community Road Sewer Expansion
Project Number:
District and General Location: North Mainland District in the Community Road Business Area
Total Budget: $TBD
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of 12-inch Water and 12-inch Sewer Extension rehabilitation along the Community Road Business Area in the North Mainland District.
Purpose: The purpose of the project is to provide the capacity to serve and extend critical infrastructure with new service lines. This will reduce the...
Project Info – North Mainland – Arco Water & Sewer Extension
Project Number: #2016
District and General Location: North Mainland District in the Arco Area Neighborhood
Total Budget: $4.1M
Anticipated Construction Completion Date: Winter 2022
Details: The project consists of 8-inch Water and 8 to 10-inch Sewer Extension rehabilitation along the Acro Area Neighborhood in the North Mainland District.
Purpose: The purpose of the project is to provide capacity to serve, extend critical infrastructure with new service lines, and enhance fire protection....
Project Info – Pump Station 2002 Forcemain Replacement
Project Number: #2014
District and General Location: Saint Simons Island District along Arnold Road
Total Budget: $TBD
Anticipated Construction Completion Date: TBD
Details: The project consists of 12-inch forcemain rehabilitation along Arnold Road in the Saint Simons Island District.
Purpose: The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based on a risk-based, asset management strategy balancing the probability of a pipe failure versus the...
The Flow Show – Episode 10