Project Number:
District and General Location: North Mainland District Water Loops installation along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway.
Total Budget: $2.M
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of water loop installations along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway in the North Mainland District via open-cut and trenchless methods.
Purpose: The purpose of the project is to eliminate dead...
Project Info – North Mainland – Canal Road Water Production Facility
Project Number:
District and General Location: North Mainland District Canal Road Well Site at104 Canal Road
Total Budget: $TBD
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of the conversion of an existing fire well to a Water Production Facility on Canal Road in the North Mainland District.
Purpose: The purpose of the project is to meet supply-demand and capacity, water storage capacity, and increased fire flow capacity into the region.
Have More...
Project Info – North Mainland – Community Road Sewer Expansion
Project Number:
District and General Location: North Mainland District in the Community Road Business Area
Total Budget: $TBD
Anticipated Construction Completion Date: Summer 2023
Details: The project consists of 12-inch Water and 12-inch Sewer Extension rehabilitation along the Community Road Business Area in the North Mainland District.
Purpose: The purpose of the project is to provide the capacity to serve and extend critical infrastructure with new service lines. This will reduce the...
Project Info – North Mainland – Arco Water & Sewer Extension
Project Number: #2016
District and General Location: North Mainland District in the Arco Area Neighborhood
Total Budget: $4.1M
Anticipated Construction Completion Date: Winter 2022
Details: The project consists of 8-inch Water and 8 to 10-inch Sewer Extension rehabilitation along the Acro Area Neighborhood in the North Mainland District.
Purpose: The purpose of the project is to provide capacity to serve, extend critical infrastructure with new service lines, and enhance fire protection....
Project Info – Pump Station 2002 Forcemain Replacement
Project Number: #2014
District and General Location: Saint Simons Island District along Arnold Road
Total Budget: $TBD
Anticipated Construction Completion Date: TBD
Details: The project consists of 12-inch forcemain rehabilitation along Arnold Road in the Saint Simons Island District.
Purpose: The purpose of the project is to prioritize pipe repairs, rehabilitation, and replacements based on a risk-based, asset management strategy balancing the probability of a pipe failure versus the...
The Flow Show – Episode 10
What’s the latest project news at the JWSC? Check out Episode 10 of the Flow Show with Jason Vo with special guest Andy Leanza, Director of Emergency Management of Glynn County, GA.
Project Info – Mainland – SPLOST 2016 Forcemain Reroute
Project Number: #702
District and General Location: North Mainland District along Harry Driggers Blvd, Canal Road, and Ogden Road
Total Budget: $4.7
Anticipated Construction Completion Date: Summer 2022
Details: The project consists of nearly 20,000 linear feet of 12- to 20-inch forcemain and 2,500 linear feet of 12 to 14-inch watermain will be installed via an open cut or trenchless directional drill method.
Purpose: The purpose of the project will reduce maintenance calls and...
Project Info – Mainland Brunswick – Pump Station 4035-4036 Upgrade
Project Number: #702
District and General Location: PS4035 on Ross Road, North Mainland District and PS4036 on B&W Grade Road, North Mainland District
Total Budget: $2.6M
Anticipated Construction Completion Date: Spring 2022
Details: The project consists of the repair of both station building roofs, painting, along with pump and piping modifications. Detailed station work includes the installation magnetic flow meter, an odor control unit, replacing outdated electrical and SCADA...
Project Info – Mainland Brunswick – Canal Rd Glynco Watermain Loop
Project Number: #704
District and General Location: North Mainland Brunswick service area between Brunswick Airport and FLETC
Total Budget: $1.2M
Anticipated Construction Start Date: Spring 2021
Anticipated Construction Completion Date: Summer 2022
Details: The project consists of nearly 9,000 linear feet of 12-inch watermain that will be installed via an open cut or trenchless directional drill method pending existing site conditions and constraints such as entranceways.
Purpose: The...