English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.
Location: Rose Cottage
Date of Outage: July 14, 2025
Time Reported: 9:15 AM
Cause: Materials failure
Date/Time Restored: July 14, 2025 / 9:45 AM
Will Boiling Water Be Required?: No
What is a Boil Water Advisory? LEARN MORE HERE
Please subscribe to our emergency notification system: https://www.bgjwsc.org/subscribe-to-updates/
Notificación de servicio...
Precautionary Boil Water Advisory for Rose Cottage – July 14, 2025
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.
Date of Outage: July 14, 2025
Time Reported: 9:15 AM
Cause: Materials Failure
Will Boiling Water Be Required?: Yes
What is a Boil Water Advisory? LEARN MORE HERE
Time of Repair: 6-12 hours
What Happens Next:
Notification will be sent when service is restored.
An all-clear notification will be sent when water no...
Precautionary Boil Water Advisory for whispering oaks – Sunday, July 13, 2025
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.
Date of Outage: July 13, 2025
Time Reported: 2:30 PM
Cause: Materials Failure
Will Boiling Water Be Required?: Yes
What is a Boil Water Advisory? LEARN MORE HERE
Estimated Time of Repair: Unknown at this time.
What Happens Next:
· Notification will be sent when service is restored.
· An all-clear notification...
Sanitary Sewer Overflow at Academy Creek in Brunswick – July 11, 2025
The Brunswick-Glynn Joint Water & Sewer Commission, NPDES Permit GA0025313, in accordance with permit requirements, makes public notice of a sanitary sewer overflow that occurred on July 11, 2025 into the Academy Creek.
Date of Spill: 7/11/2025
Time: 12:45 AM
Location of Spill: 2909 Newcastle Street
Cause of Spill: Heavy rainfall led to significantly increased flows at the plant. The planned capital improvement project underway at the facility has temporarily reduced high flow capacity...
Project Info – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 3 Water Loops
Project Number: 2216S – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 3 Water Loops
District and General Location: South Mainland District – At the entrance of Planting Hammock Subdivision and adjacent to 186 Cinder Hill Drive in Brunswick, Georgia
Total Budget: $418,000
Anticipated Construction Completion Date: February 2026
Details: The project consists of water loop installations along Planting Hammock and between Cinder Hill Drive and Bartram Trail via...
Project Info – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 2 500K Elevated Storage Tank
Project Number: 2216S – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 2 500K Elevated Storage Tank
District and General Location: South Mainland District – 503 South Port Parkway in Brunswick, Georgia.
Total Budget: $7.68M
Anticipated Construction Completion Date: February 2027
Details: Construction of the 500,000-gallon composite elevated storage tank.
Purpose: The installation of a new elevated storage tank, including electrical and SCADA system...
Project Info – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 1 Water Production Facility
Project Number: 2216S – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 1 Water Production Facility
District and General Location: South Mainland District – 391 South Port Parkway in Brunswick, Georgia.
Total Budget: $4.64M
Anticipated Construction Completion Date: June 2026
Details: Construction of the well treatment improvements, pump control building, and 200,000-gallon groundwater storage tank.
Purpose: Updating and improving the water production system to...
Project Info – North Mainland Exit 42 Elevated Storage Tank
Project Number: 2213 – North Mainland Exit 42 Elevated Storage Tank
District and General Location: North Mainland District – 118 Cherokee Trail in Brunswick, Georgia.
Total Budget: $4.73M
Anticipated Construction Completion Date: TBD
Details: Construction of the 750,000-gallon composite elevated storage tank.
Purpose: The installation of a new elevated storage tank, including electrical and SCADA system components, is planned to accommodate both current and future requirements of the...
RFP No. 26-001 Financial System, Customer Information System (CIS) & Utility Billing System
RFP No. 26-001 Financial System, CIS, & Utility Billing System
EXHIBIT 1 – INSURANCE REQUIREMENTS
Exhibit 2 – Vendor Profile
Exhibit 3 – References Form
Exhibit 4A – Financials Requirements Matrix
Exhibit 4B – Billing & CIS Requirements Matrix
Exhibit 5 – Staffing Plan
Exhibit 6 – Pricing Worksheet
Exhibit 7 – Contractor Affidavit
Agenda-Pre-BidTeleconference-RFP 26-001 – Fin Sys-Customer Info Sys – Utility Bill Sys –...
Commission Meeting Minutes – Thursday, April 17, 2025
For your consideration, please read the minutes from the Commission Meeting held on Thursday, April 17, 2025 at 2:00 p.m. in the Commission Meeting Room.
Commission_Minutes_04-17-2025_with Attachments
To read the minutes, please open or download the pdf from the link above, or you may see more below.
Brunswick-Glynn Joint Water and Sewer Commission
1703 Gloucester Street, Brunswick, GA 31520
Commission Meeting Room
Thursday, April 17, 2025, at 2:00 pm
COMMISSION MINUTES
PRESENT: ...