Project Number:
District and General Location: PS 2033 on 2913 Lawrence Road, Saint Simons Island PS 2034 on 130 Rice Mill Road, Saint Simons Island
Total Budget: $1.4M
Anticipated Construction Completion Date: TBD
Details: The project consists of the rehabilitation of Pump Station 2033 and 2034 due to the existing condition North end of Saint Simons Island.
Purpose: The purpose of the project is to ensure continuous delivery of wastewater to the Dunbar Treatment Plant. Improvements...
Project Info – SSI – Pump Station 2056 Pumps and Forcemain Improvements
Project Number:
District and General Location: Located in the Saint Simons Island District along Lawrence Road.
Total Budget: $700k
Anticipated Construction Completion Date: TBD
Details: The project consists of installing new pumps, discharge piping, and a parallel forcemain.
Purpose: The purpose of the project is to operate with better efficiency, reduce maintenance and provide up-to-date monitoring with enhanced technology. And for the new sewer main installation to reduce maintenance...
Project Info – Systemwide – Water Production SCADA
Project Number:
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District
Total Budget: $750k
Anticipated Construction Completion Date: TBD
Details: The project consists of converting the existing Water Production Supervisory Control and Data Acquisition (SCADA) to the new VTSCADA system. The existing control system receives input from several controls and instruments, many of which are reaching the end of their useful lives and...
Project Info – Systemwide – GA Environmental Finance Authority Loan Debt Service
Project Number:
District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District.
Total Budget: $1.21M
Anticipated Construction Completion Date: TBD
Details: GEFA’s water and sewer financing programs offer low-interest financing for drinking water, reservoirs and water supply, water quality, stormwater and solid waste infrastructure. The JWSC has secured GEFA’s Clean Water State Revolving Fund Loan.
Purpose: The purpose of the loan is...
Project Info – Mainland – Water Pollution Rehab-Academy
Project Number: #906
District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street.
Total Budget: $7.2M
Anticipated Construction Completion Date: Summer 2022
Details: The project has a variety of system improvement projects related to rehabilitation or replacement of unit processes and facilities at the plant to ensure continuous and reliable operations.
Purpose: The purpose of the project is to more effectively treat current flows and treat the...
Project Info – Mainland – Basin 4036 CIPP
Project Number: #2001
District and General Location: North Mainland District Pump Station 4036 Gravity Basin
Total Budget: $1M
Anticipated Construction Completion Date: Summer 2022
Details: The project consists of Cleaning, Closed-circuit television, and Cure-in-Place Pipe (CIPP) rehabilitation of the sewer mainline in the North Mainland District Pump Station 4036 Gravity Basin ranging from 15-inch to 30-inch in diameter
Purpose: The purpose of the CIPP process is to reduce and eliminate...
Project Info – Systemwide – Annual Galvanized Replacement Program
Project Number: #2021
District and General Location: Various locations in North mainland, South Mainland, and Saint Simons Island District
Total Budget: $250k
Anticipated Construction Completion Date: TBD
Details: The project consists of an annual allotment to remove galvanized lines that have corroded from the inside out, causing pinhole leaks, rusty color water, and fluctuation in water temperature and pressure.
Purpose: The purpose of the project is to improve water quality and system...