Skip to main content
(912) 261-7100    |   Contact Us    |    MyUsage

Project Info – Mainland – Basin 4036 CIPP

  • Project Number: #2001
  • District and General Location: North Mainland District Pump Station 4036 Gravity Basin
  • Total Budget: $1M
  • Anticipated Construction Completion Date: Summer 2022
  • Details: The project consists of Cleaning, Closed-circuit television, and Cure-in-Place Pipe (CIPP) rehabilitation of the sewer mainline in the North Mainland District Pump Station 4036 Gravity Basin ranging from 15-inch to 30-inch in diameter
  • Purpose: The purpose of the CIPP process is to reduce and eliminate cracks, and holes that would otherwise allow rainwater and roots to enter the sewer pipe and cause operational problems such as stoppages and overflows.
  • Have More Questions? Please contact W. Todd Kline, P.E., Director of Engineering tkline@bgjwsc.org

Visual Summary:

Monthly Active Construction Project Photo Report(s):

2022_April_Project_Photos_-_Mainland_PS4105_Basin-Expansion-Forcemain-Reroute-And-4036

2022_May_Project_Photos_-_Mainland_PS4105_Basin-Expansion-Forcemain-Reroute-And-4036

2022_June_Project_Photos_-_Mainland_PS4105_Basin-Expansion-Forcemain-Reroute-And-4036