Skip to main content
(912) 261-7100    |   Contact Us    |    MyUsage

Author: Byron Bennett

Project Info – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 2 500K Elevated Storage Tank

Project Number: 2216S – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 2 500K Elevated Storage Tank District and General Location: South Mainland District – 503 South Port Parkway in Brunswick, Georgia. Total Budget: $7.68M Anticipated Construction Completion Date: February 2027 Details: Construction of the 500,000-gallon composite elevated storage tank. Purpose: The installation of a new elevated storage tank, including electrical and SCADA system...

Continue reading

Project Info – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 1 Water Production Facility

Project Number: 2216S – SPLOST Exit 29 Water Production Facility and Elevated Storage Tank – Division 1 Water Production Facility District and General Location: South Mainland District – 391 South Port Parkway in Brunswick, Georgia. Total Budget: $4.64M Anticipated Construction Completion Date: June 2026 Details: Construction of the well treatment improvements, pump control building,  and 200,000-gallon groundwater storage tank. Purpose: Updating and improving the water production system to...

Continue reading

Project Info – North Mainland Exit 42 Elevated Storage Tank

Project Number: 2213 – North Mainland Exit 42 Elevated Storage Tank District and General Location: North Mainland District – 118 Cherokee Trail in Brunswick, Georgia. Total Budget: $4.73M Anticipated Construction Completion Date: TBD Details: Construction of the 750,000-gallon composite elevated storage tank. Purpose: The installation of a new elevated storage tank, including electrical and SCADA system components, is planned to accommodate both current and future requirements of the...

Continue reading

Service Restored Notification near Habersham Street – June 24, 2025

English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.   Location: Habersham Street Date of Outage: June 24, 2025 Time Reported: 12:11 PM Cause: Materials Failure Date/Time Restored: June 24, 2025 Will Boiling Water Be Required?: No   What is a Boil Water Advisory? LEARN MORE HERE   Please subscribe to our emergency notification system: https://www.bgjwsc.org/subscribe-to-updates/   Notificación de servicio...

Continue reading

Emergency Water Service Outage near Habersham Street – June 24, 2025

English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.   Date of Outage: June 24, 2025 Time Reported: 12:11 Cause: Materials Failure Will boiling water be required? Unknown at this time.   What is a Boil Water Advisory? LEARN MORE HERE   Estimated Time of Repair: 6-12 hours. What Happens Next: Notification will be sent when service is restored. A boil water advisory may be required. Updates will be provided via our...

Continue reading

Planned Water Service Outage for Chapel Crossing – June 10, 2025

Date of Outage: June 10, 2025 Time: 7:30 AM Cause: Relocating Waterline Will boiling water be required? No   What is a Boil Water Advisory? LEARN MORE HERE   Estimated Time of Repair: 2:00 PM What Happens Next: A notification will be sent when service is restored. A boil water advisory may be required. Updates will be provided via our website: https://www.bgjwsc.org/news Please also subscribe to our emergency notification system: https://www.bgjwsc.org/subscribe-to-updates/ ...

Continue reading

All-Clear Notification for Warren Mason Blvd – May 28, 2025

English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.   Location: Warren Mason Blvd Date of Outage: May 28, 2025 Time Reported: 4:15 PM Cause: Materials Failure Date/Time Restored: May 28, 2025 / 10:00 PM Effective immediately, all required microbiological testing of water samples from the area affected by the boil water advisory has passed. Results have been verified by our state-licensed technician within a certified laboratory...

Continue reading

BGJWSC Budget and Rates Town Hall Meetings Scheduled For June 2025

Each year, we hold a pair of public town hall meetings to discuss our path going forward, present the priorities of our budget prepared to help us reach our goals during the coming year, plus outline any rate and fee changes proposed. This year, we will hold our first meeting from 6:00 PM to 7:00 PM on Wednesday, June 11, in the Howard Coffin Park auditorium at 1402 Sonny Miller Way in Brunswick. The following night, Thursday, June 12, our second meeting will be held from 6:00 PM to 7:00 PM...

Continue reading

Service Restored Notification – Continue to Boil for Warren Mason Blvd – May 28, 2025

BOIL YOUR WATER FOR THREE MINUTES BEFORE USING   English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.   Location: Warren Mason Blvd Date of Outage: May 28, 2025 Time Reported: 4:15 PM Cause: Materials Failure Date/Time Restored: May 28, 2025 / 10:00 PM Will Boiling Water Be Required?: Yes   What is a Boil Water Advisory? LEARN MORE HERE   What Happens Next: An all-clear notification will be sent when water no longer...

Continue reading

Emergency Water Service Outage for Warren Mason Blvd – May 28, 2025

English and Spanish Versions are Provided Below – A continuación se proporcionan versiones en inglés y español.   Date of Outage: May 28, 2025 Time Reported: 4:15 PM Cause: Materials Failure Will boiling water be required? Unknown at this time.   What is a Boil Water Advisory? LEARN MORE HERE   Estimated Time of Repair: 6-12 hours. What Happens Next: Notification will be sent when service is restored. A boil water advisory may be required. Updates will be provided via our...

Continue reading