Skip to main content
(912) 261-7100    |   Contact Us    |    MyUsage

HWY 341/Crispen BLVD

Project Number: #2215B District and General Location: North Mainland District HWY 341 and Crispen BLVD Intersection Total Budget: $700k Anticipated Construction Completion Date: November 2023 Details: The project consists of a sewer line repair that has corroded from the inside out, causing a sinkhole underneath the roadway. The anticipated start date will be following the Labor Day holiday. Purpose: The purpose of the project is to repair the failed sewer line and restore the roadway...

Continue reading

Emergency Road Closure for Sewer Collection System Repairs – 800 Block of T Street in Brunswick – Wednesday, August 16, 2023

Attention Emergency Road Closure Notification Brunswick: To perform sanitary sewer gravity main replacement due to a collapsed line, commuters of T Street will experience a full road closure on the 800 block between Norwich Street and Ellis Street. The road closure will begin at 9:00 a.m. on Wednesday, August 16, and last until 7:00 p.m. Homeowner/business access will be maintained but all other traffic should be prepared to take another route. The BGJWSC apologizes in advance for the...

Continue reading

All-Clear for Boil Water Advisory Issued for Mallory Villas and Courtyard Villas on August 8, 2023

Effective immediately, as of 1:31 PM on Wednesday, August 9, 2023, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Mallory Villas and Courtyard Villas on Tuesday, August 8, 2023 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment. This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled. Though the water from this system can...

Continue reading