Skip to main content
(912) 261-7100    |   Contact Us    |    MyUsage

ITB No. 24-002 Construction Services for 4002 Basin CIPP (Cured-In-Place Pipe) Rehabilitation

ITB 24-002 Construction Services 4002 Basin CIPP Rehabilitation 4002 CIPP_S1 4002 CIPP_S2 4002 CIPP_SP EXHIBIT D-IFB 24-002 4002 BASIN CIPP REHABILITATION Addendum 1 — IFB No. 24-002 4002 Basin CIPP Rehabilitation Addendum 2 — IFB No. 24-002 4002 Basin CIPP Rehabilitation ITB 24-002 Construction Services 4002 Basin CIPP Rehabilitation-REFERENCE Document-13MAR2024 REVISED EXHIBIT C – ASSET LOCATION LISTING with PIPE DIAMETER AND LENGTH-13MAR2024 Addendum 3 — IFB No....

Continue reading

ITB No. 24-006 Construction Services for Brunswick Villa Area Sewer Extension

ITB 24-006 CONSTRUCTION SERVICES FOR BRUNSWICK VILLA AREA SEWER MAIN EXTENSION – PROJECT NO. 2209 EXHIBIT A – TECHNICAL SPECIFICATIONS _JWSC BWK VILLA_PROJECT 2209 BRUNSWCK VILLA AREA SEWER EXTENSIONS – EXHIBIT A – WITH POTENTIAL POINT OF CONNECTION DETAIL EXHIBIT B – PLANS_JWSC BWK VILLA_PROJECT 2209 EXHIBIT C_JWSC Standard Insurance Requirements EXHIBIT D_ Sample Contract General Conditions BID FORM_JWSC BWK VILLA_PROJECT 2209 – EXCEL FORMAT  Registered...

Continue reading

Emergency Water Outage – Herrington Ln/North Herrington Rd on Saint Simons Island – Tuesday, February 13, 2024

Attention Emergency Road Closure Notification To address a stormwater utility conflict in the area, water service on Harrington Lane will be intermittently disrupted beginning at 9:00 am this morning, Tuesday, February 13, 2024, while staff reroutes a distribution main. Service will be restored as quickly as possible.  No boil water advisory is expected due to the use of controlled shutdown procedures. The BGJWSC apologizes in advance for the inconvenience.

Continue reading

Full Water Pressure Restored for Residents of Glynn Haven, SSI – February 12, 2024

Effective immediately, as of 7:50 PM on Monday, February 12, 2024, full water pressure has been restored for residents of Glynn Haven neighborhood on St. Simons Island. BGJWSC staff repaired a main break caused by a contractor severing the pipe. As water pressure was maintained during the repair according to established guidelines, water does not need to be boiled and meets safe drinking water standards.

Continue reading

ITB No. 24-008 Construction Services for Palm Drive & Frederica Road Water Main Crossing

ITB 24-008 CONSTRUCTION SERVICES PALM DR-FREDERICA RD WATERMAIN CROSSING ITB 24-008 EXHIBIT A – PALM DR-FREDERICA RD-PROPOSED LINE ROUTE ITB 24-008 EXHIBIT B – PALM DR-FREDERICA RD-PROPOSED DETOUR PLAN ITB 24-008 – PALM DR-FREDERICA RD-BID FORM (Excel) ITB No. 24-008 Bid Opening Attendance Bids Received – ITB No. 24-008 Palm Drive & Frederica Watermain Crossing Notice of Award — ITB No. 24-008 Palm Drive Water Main Improvements

Continue reading