DRINKING WATER WARNING
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
The Brunswick water system lost pressure on the distribution network serving sections of Line St., Clairmont and the surrounding areas due to the installation of a new water main. Service has been restored and BGJWSC lab personnel have collected water samples for testing. This testing, which takes between 18 and 24 hours, should be completed the afternoon of Wednesday, September 15, 2021 at which time an all-clear message...
Precautionary Boil Water Advisory – Sections of Island Club and Ashantilly Area on SSI – September 13, 2021
DRINKING WATER WARNING
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
The St Simons Island water system lost pressure on the distribution network serving sections of Island Club and Ashantilly due to a private contractor digging into a main. Service has been restored and BGJWSC lab personnel have collected water samples for testing. This testing, which takes between 18 and 24 hours, should be completed the afternoon of Tuesday, September 14, 2021 at which time an all-clear message will be...
Planned Water Outage – Line St. to Clairmont Ln. in Brunswick – September 14, 2021 Anticipated time 10 am to 1 pm.
Attention
Planned Water Outage
In order for BGJWSC staff to complete the addition of a new waterline in the area, water service will be interrupted from at or about 10:00 a.m. to 1:00 p.m. on Tuesday, September 14, 2021 for service connections on Line St and Clairmont Ln. and adjacent streets.
Once service has been restored, a precautionary boil water advisory may be issued until 24 hours following the last point of repair. Please subscribe to receive emergency updates via text message,...
Commission Meeting Public Notice – Thursday, September 16, 2021 @ 2:00 PM
For your consideration, please review the public notice for the Commission Meeting scheduled to be held on Thursday, September 16, 2021 at 2:00 p.m. in the Commission Meeting Room.
Commission_Meeting_Public_Notice_September_16,_2021 – Posted 9-8-21.
Finance Committee Meeting Public Notice – Wednesday, September 15, 2021 @ 3:00 PM
For your consideration, please review the public notice for the Finance Committee Meeting scheduled to be held on Wednesday, September 15, 2021 at 3:00 p.m. in the Commission Meeting Room.
Finance Committee_Public_Notice_September_15,_2021 – Posted 9-8-21.
Facilities Committee Meeting Public Notice – Wednesday, September 15, 2021 @ 1:00 PM
For your consideration please review the public notice for the Facilities Committee Meeting scheduled to be held on Wednesday, September 15, 2021 at 1:00 p.m. in the Commission Meeting Room.
Facilities_Committee_Public_Notice_September_15,_2021 – Posted 9-8-21.
Invitation to Bid No. 22-009 Oak Grove Force Main Improvements
IFB NO. 22-009 Oak Grove Forcemain Improvements
Oak Grove FM_Tech Spec
Oak Grove FM_Drawings
Oak Grove FM_Summary of Work
Oak Grove FM_Special Condition
Agenda-Teleconference- 22-009 Oak Grove Force Main Improvements
Pre-Bid Meeting Attendance — Oak Grove Force Main
IFB No. 22-009 Oak Grove Force Main Improvements — Addendum 1
Oak Grove Bid Form (RCE Edit 9-27)
Oak Grove Forcemain Bids Submitted 10-05-21
Solicitation Openings 10-05-21
Request for Proposal No. 22-008 Engineering Services for North Mainland Water Loops
RFP NO. 22-008 Engineering Services N Mainland Water Loops
PROJECT NO. 2103 – PROJECT AREA MAPS
RFP No. 22-008 Addendum 1 — North Mainland Water Loops Engineering
RFP No. 22-008 Pre-Proposal Registration N Mainland Water Loops Engineering
RFP No. 22-008 Addendum 2 — North Mainland Water Loops Engineering
RFP No. 22-008 Addendum 3 — North Mainland Water Loops Engineering
Proposals Submitted — 22-008 North Mainland Water Loops Engineering
Notice of Award —...
Invitation for Bid No. 22-006 Dunbar Creek WPCF Aeration Basin No. 2 Painting
22-006 Dunbar Creek WPCF Aeration Basin No. 2 Painting
TECHNICAL SPECIFICATION -22-006 Dunbar Creek Aeration Basin No. 2 Painting
Contract-General Conditions
Contract Sample-CONSTRUCTION
Agenda-PreBidSiteVisit- 22-006 DunbarCreekWPCF Aeration Basin No. 2 Painting
IFB No. 22-006 Dunbar Creek Aeration Basin No. 2 Painting — Addendum 1
22-006 Dunbar Creek WPCF Aeration Basin No. 2 Painting-BID Form ONLY
Dunbar Creek Aeration Basin No. 2 Site Visit Attendance
IFB No. 22-006 Dunbar Creek...
All-Clear for Boil Water Advisory Issued for Killarney in Island Club on SSI
Effective immediately, as of 3:05 PM on Thursday, August 26, 2021, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Killarney in Island Club on Wednesday, August 25, 2021 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment.
This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.
Though the water from this system can now be...