Project Info – Mall EST and Oglethorpe EST Rehab

Project Number: District and General Location: Glynn Place Mall EST, North Mainland District Oglethorpe EST, Saint Simons Island District. Total Budget: $1M Anticipated Construction Completion Date: TBD Details: The project consists of rehabilitation and painting for the Elevated Storage Tank (EST) at Glynn Place Mall EST and Oglethorpe EST. Purpose: The purpose of the project is to provide reliable water supply and pressure for the surrounding community and fire suppression needs while preserving...

Continue reading

Project Info – North Mainland – Pump Station 4105 Forcemain Reroute

Project Number: District and General Location: Located in the North Mainland District along Cate Road and Crispen Boulevard toward Highway 341. Total Budget: $1.25M Anticipated Construction Completion Date: TBD Details: The project consists of installing a new forcemain from Pump Station 4105 to Highway 341 Purpose: The purpose of the project will reduce maintenance calls and disruptions. The reroute will also be shorter in length than the current alignment, which will result in energy savings...

Continue reading

Project Info – Systemwide – Water Production SCADA

Project Number: District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District Total Budget: $750k Anticipated Construction Completion Date: TBD Details: The project consists of converting the existing Water Production Supervisory Control and Data Acquisition (SCADA) to the new VTSCADA system.  The existing control system receives input from several controls and instruments, many of which are reaching the end of their useful lives and...

Continue reading

Project Info – Academy Creek Ras Replacement

Project Number: District and General Location: Academy Creek Water Pollution Control Plant on 2909 Newcastle Street. Total Budget: $1.5M Anticipated Construction Completion Date: TBD Details: The project consists of replacing existing return activated sludge (RAS) pumps, piping, and electrical with chopper-style pumps due to the existing equipment systems reaching the end of their service life and needing to be replaced. Purpose: The purpose of the project is to replace aging equipment to maintain...

Continue reading

Project Info – Systemwide – GA Environmental Finance Authority Loan Debt Service

Project Number: District and General Location: Systemwide upgrade for North Mainland, South Mainland, and Saint Simons Island District. Total Budget: $1.21M Anticipated Construction Completion Date: TBD Details: GEFA’s water and sewer financing programs offer low-interest financing for drinking water, reservoirs and water supply, water quality, stormwater and solid waste infrastructure. The JWSC has secured GEFA’s Clean Water State Revolving Fund Loan. Purpose: The purpose of the loan is to...

Continue reading

Project Info – South Mainland – City of Brunswick – Pump Station 3101, 4001, and 4002 Upgrade

Project Number: District and General Location: PS3101 on 293 South Port Parkway, South Mainland PS4001 on 301 3rd Avenue, the City of Brunswick PS4002 on 1309 Reynold Street, City of Brunswick. Total Budget: $TBD Anticipated Construction Completion Date: TBD Details: The project consists of the repair of the station roofs, and painting, along with pump and piping modifications. Detailed station work includes the magnetic flow meter installation, odor control unit, replacing outdated electrical...

Continue reading

Project Info – North Mainland – North Mainland Water Loops

Project Number: District and General Location: North Mainland District Water Loops installation along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway. Total Budget: $2.M Anticipated Construction Completion Date: Summer 2023 Details: The project consists of water loop installations along Hautala, Bailey Road, Old Jesup Road, and Golden Isles Parkway in the North Mainland District via open-cut and trenchless methods. Purpose: The purpose of the project is to eliminate dead ends...

Continue reading

Project Info – North Mainland – Canal Road Water Production Facility

Project Number: District and General Location: North Mainland District Canal Road Well Site at104 Canal Road Total Budget: $TBD Anticipated Construction Completion Date: Summer 2023 Details: The project consists of the conversion of an existing fire well to a Water Production Facility on Canal Road in the North Mainland District. Purpose: The purpose of the project is to meet supply-demand and capacity, water storage capacity, and increased fire flow capacity into the region. Have More Questions?...

Continue reading

Project Info – North Mainland – Community Road Sewer Expansion

Project Number: District and General Location: North Mainland District in the Community Road Business Area Total Budget: $TBD Anticipated Construction Completion Date: Summer 2023 Details: The project consists of 12-inch Water and 12-inch Sewer Extension rehabilitation along the Community Road Business Area in the North Mainland District. Purpose: The purpose of the project is to provide the capacity to serve and extend critical infrastructure with new service lines. This will reduce the operation...

Continue reading

Project Info – North Mainland – Arco Water & Sewer Extension

Project Number: #2016 District and General Location: North Mainland District in the Arco Area Neighborhood Total Budget: $4.1M Anticipated Construction Completion Date: Winter 2022 Details: The project consists of 8-inch Water and 8 to 10-inch Sewer Extension rehabilitation along the Acro Area Neighborhood in the North Mainland District. Purpose: The purpose of the project is to provide capacity to serve, extend critical infrastructure with new service lines, and enhance fire protection. Have...

Continue reading