For your consideration, please read the minutes from the Construction Standards Workshop held on Thursday, April 20, 2023 at 10:00 a.m. in the Commission Meeting Room.
Workshop Minutes 4-20-23 with Attachments
To read the minutes please open or download the pdf from the link above, or you may see more below.
Invitation to Bid No. 23-011 Construction Services for North Mainland Water Loops Project No. 2103
ITB 23-011 – Construction Services for North Mainland Water Loops – JWSC Project No. 2103
NMWL_Drawings_05-19-2023
NMWL_Tech Specs_05-19-2023
NMWL Appendix A-Geotechnical Engineering Investigation Report
NMWL Appendix B-Underground Utilities Locating Report
NMWL Appendix C-Georgia EPD, Notice of Intent Permit
NMWL Appendix D-Georgia EPD Drinking Water Permit
NMWL Appendix E-Georgia DOT Roadway Encroachment Application
NMWL Appendix F-US Army Corp of Engineers Wetland Encroachment...
Finance Committee Meeting Minutes – Wednesday, April 19, 2023
For your consideration, please read the minutes from the Finance Committee Meeting held on Wednesday, April 19, 2023 at 3:00 p.m. in the Commission Meeting Room.
A1 – Finance Minutes 4-19-23
To read the minutes, please open or download the pdf from the link above, or you may see more below.
Facilities Committee Meeting Minutes – Wednesday, April 19, 2023
For your consideration, please read the minutes from the Facilities Committee Meeting held on Wednesday, April 19, 2023 at 1:00 PM in the Commission Meeting Room.
Facilities Minutes 4-19-20 with Attachments
To read the minutes please download or open the pdf from the link above or you may see more below.
All-Clear for Boil Water Advisory Issued for Harbour Oaks on SSI on May 23, 2023
Effective immediately, as of 12:25 PM on Wednesday, May 24, 2023, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Harbour Oaks on Tuesday, May 23, 2023 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment.
This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.
Though the water from this system can now be considered to meet...
Precautionary Boil Water Advisory – Harbour Oaks on St Simons Island – May 23, 2023
DRINKING WATER WARNING
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
The St Simons Island water system lost pressure on the distribution network serving Harbour Oaks due to a utility contractor digging into the water main. Once service has been restored, BGJWSC lab personnel will collect water samples for testing. This testing, which takes between 18 and 24 hours, should be completed the afternoon of Wednesday, May 24, 2023, at which time an all-clear message will be posted.
This loss of...
New Employment Opportunity- Utility Service Worker
New Employment Opportunity – Utility Service Worker
The Brunswick-Glynn Joint Water & Sewer Commission is pleased to announce the following employment opportunity:
Job Title: Utility Service Worker
Open Date: December 23, 2024
Close Date: Open until filled
Position Information: Full-time, permanent position
Number of openings: 2
Starting Pay Range: $18.04-$20.30 per hour
Click the link below to view the job description for this vacancy.
Utility Service Worker I
Please visit our Human...
All-Clear for Boil Water Advisory Issued for Oak Acres in Brunswick on May 18, 2023
Effective immediately, as of 3:06 PM on Friday, May 19, 2023, all required microbiological testing of water samples from the area affected by the boil water advisory issued for Oak Acres on Thursday, May 18, 2023 have passed. Results have been verified by our state-licensed technician within a certified laboratory environment.
This notification is an ALL-CLEAR and water used for drinking will no longer need to be boiled.
Though the water from this system can now be considered to meet safe...
Precautionary Boil Water Advisory – Oak Acres in Brunswick – May 18, 2023
DRINKING WATER WARNING
BOIL YOUR WATER FOR THREE MINUTES BEFORE USING
The Brunswick water system lost pressure on the distribution network serving Oak Acres due to lightning striking the ground in the area of a 2-inch PVC pipe. Once service has been restored, BGJWSC lab personnel will collect water samples for testing. This testing, which takes between 18 and 24 hours, should be completed the afternoon of Friday, May 19, 2023, at which time an all-clear message will be posted.
This loss of...
Commission Meeting Agenda – Thursday, May 18, 2023 @ 2:00 PM
For your consideration, please review the agenda for the Commission Meeting scheduled to be held Thursday, May 18, 2023 at 2:00 p.m. in the Commission Meeting Room.
Commission_Agenda_May_18,_2023-JLB
Commission_Agenda_May_18,_2023 – Posted 5-12-23