Project Info – Systemwide – Annual Galvanized Replacement Program

Project Number: #2021 District and General Location: Various locations in North mainland, South Mainland, and Saint Simons Island District Total Budget: $250k Anticipated Construction Completion Date: TBD Details: The project consists of an annual allotment to remove galvanized lines that have corroded from the inside out, causing pinhole leaks, rusty color water, and fluctuation in water temperature and pressure. Purpose: The purpose of the project is to improve water quality and system...

Continue reading

Project Info – Mainland Brunswick – Canal Rd Glynco Watermain Loop

Project Number: #704 District and General Location: North Mainland Brunswick service area between Brunswick Airport and FLETC Total Budget: $1.2M Anticipated Construction Start Date: Spring 2021 Anticipated Construction Completion Date: Summer 2022 Details: The project consists of nearly 9,000 linear feet of 12-inch watermain that will be installed via an open cut or trenchless directional drill method pending existing site conditions and constraints such as entranceways. Purpose: The...

Continue reading